interim cryogenic propulsion stage (ICPS) with the ground systems at Kennedy. Due to the changes in loading procedures required for the modified test, wet dress rehearsal testing is slated to resume with call to stations on Tuesday, April 12 and tanking on Thursday, April 14. Wet dress rehearsal is an opportunity to refine the countdown procedures and validate critical models and software interfaces. The modified test will enable engineers to achieve the test objectives critical to launch success.
Engineers have identified a helium check valve that is not functioning as expected, requiring these changes to ensure safety of the flight hardware. Helium is used for several different operations, including purging the engine, or clearing the lines, prior to loading propellants during tanking, as well as draining propellant. A check valve is a type of valve that allows liquid or gas to flow in a particular direction and prevents backflow. The helium check valve is about three inches long and prevents the helium from flowing back out of the rocket.
Following the modified test, the Space Launch System rocket and Orion spacecraft will return to the Vehicle Assembly Building (VAB) where engineers will evaluate the valve and replace if needed. Teams are confident in the ability to replace the valve once back in the VAB.
NASA will host a teleconference to discuss details on Monday, April 11. Check back at this blog for an update on the countdown timeline prior to the modified wet dress rehearsal testing for the Artemis I mission. NASA is streaming live video of the rocket and spacecraft on the Kennedy Newsroom YouTube channel.
“음악 팬. 매우 겸손한 탐험가. 분석가. 여행 괴짜. 익스트림 TV 전문가. 게이머.”
More Stories
Legionnaires는 이 특별한 럭셔리 기능과 연결된 두 개의 별도 크루즈를 타고 출발합니다.
120년의 성장 끝에 일본 대나무가 이제 막 꽃을 피우고 있는 것이 문제다.
SpaceX, 10월 30일 캘리포니아에서 20개의 Starlink 인터넷 위성 발사